When

Wednesday, March 10, 2021 from 12:00 PM to 1:00 PM EST
Add to Calendar 

Where

This is an online event. 
 

 
 

Contact

Anat Mor 
SAME Hampton Roads Post 
 
amor@burnsmcd.com 
 

SAME Hampton Roads March Program - CBBT Parallel Thimble Shoal Tunnel Project 

Parallel Thimble Shoal Tunnel Project

 Abstract:  The Parallel Thimble Shoal Tunnel Project is the continuation of the expansion of the Chesapeake Bay Bridge-Tunnel facility from the a two-lane to a four-lane facility, that was started in the 1990s.  The parallel bridge spans were completed in 1999.  The Parallel Thimble Shoal Tunnel Project is the first of the two tunnels to be constructed to add additional lanes at the underwater crossings.  This presentation will provide an overview of the project and current status of the construction. 

Presented by: Michael T. Crist, P.E., Deputy Executive Director of Infrastructure, Chesapeake Bay Bridge and Tunnel District

 

You should receive a confirmation email with the Microsoft Teams meeting link. If you do not receive this link, please email amor@burnsmcd.com or lazelesnikar@isoftusa.net.

 

This event is free for SAME Members, however, we are using it to collect donations for our STEM and Scholarship programs. Please select the appropriate registration type on the following page.

To join SAME, visit the membership homepage:

https://www.same.org/Discover-SAME/Be-a-Member

For more information on membership, contact the Vice President of Membership, Brett Patterson 

bpatterson@mebgc.com