You are on page 1of 1

Mastering a New System

PROJECT NAME
Indirect Evaporative Cooling (IEC)
HVAC Installation

PROJECT LOCATION
North Carolina

PROJECT TEAM
General Contractor:
Turner Construction
Contractor: McKenneys, Inc.

SPECIALIZATIONS
Building Information Modeling
Design/Assist

MARKETS
Mission Critical
Science & Technology

M
cKenneys installed an atypical an indirect evaporative cooling systema resources using the strengths of employees
HVAC system at the data center cutting-edge energy efficient HVAC system that were more familiar with the new technol-
of a Fortune 100 company. that required extensive planning to hit new ogy. Furthermore, additional project manage-
installation milestones. ment leadership was dedicated to the site
THE CHALLENGE to ensure the project was properly managed
It was McKenneys first time working for this THE SOLUTION and executed.
customer, and although the teams are always The team devoted significant time to main-
mindful of the importance of safety, quality taining quality and productivity standards by THE RESULTS
and productivity, on this project they were pre-planning and coordinating with the owner, The team exceeded quality standards, project
held to rigid quality requirements by the cus- their subcontractors and the HVAC equipment milestones and built a positive relationship
tomer. The team installed and commissioned manufacturer. The McKenneys team allocated with this new customer.

404-622-5000 704-357-1200
info@mckenneys.com info@mckenneys.com
1056 Moreland Industrial Boulevard 3601 Performance Road
Atlanta, Georgia 30316 www.mckenneys.com Charlotte, North Carolina 28214
2017 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.