Today Gansett Ranger and Illusions got a deck lift. We installed a product called U-dek. It took us two hours per boat to do the cockpit and swim platform. The pieces were computer measured and cut on a CNC machine. We stress tested the product before purchasing. We coated it with a 45 minute tuna blood bath, ketchup, cooking oil, old motor oil and red wine. The most difficult to remove was the old motor oil, but it did come out. Time will tell if it can withstand the usual wear and tear, but we figured we would give it a shot. Below is the end result of the cockpit. We did the swim platform as well, but I did not get a shot of that.