Route 15 Bypass Interchange at Edwards Ferry Road and Fort Evans Road in the Town of Leesburg

Lat/Long: 39.112051, -77.537864

    Overview

    This project will construct a new interchange at the Route 15 Bypass intersections of Edwards Ferry Road and Fort Evans Road, including new crosswalks and sidewalks along the Route 15 Bypass at Edwards Ferry Road and Fort Evans Road, and a new shared-use path along westbound Fort Evans Road. 

    The project area has experienced significant commercial growth over the past few decades. As a result, traffic volumes are beyond the capacity of the existing at-grade signalized intersections.

    Currently, there is heavy congestion due to high traffic volumes on the Bypass during peak periods, as well as heavy turn movements to and from Edwards Ferry Road and Fort Evans Road. The existing road network lacks continuous sidewalks and existing conditions do not allow bicyclists and pedestrians to safely cross Route 15.

    Estimated Costs
    Preliminary Engineering - $10.4 million
    Right of Way Acquisition and Utility Relocation - $13.9 million
    Construction: $157 million
    Total: $181.2 million

    The project is funded through preliminary engineering and is financed with federal and Northern Virginia Transportation Authority funds.

    Within the project limits, Route 15 averages about 52,000 vehicles a day, Edwards Ferry Road averages about 29,000 and Fort Evans Road averages 13,000.

    Benefits 

    The project aims to relieve congestion and improve safety, operations and accessibility for drivers, bicyclists and pedestrians.

    Major Milestones 

    Begin Preliminary Engineering - November 2015
    First Public Information Meeting - March 2016
    Second Public Information Meeting - March 2017
    Design Public Hearing - May 2018
    Design Approval - May 2019
    Begin Right of Way Acquisition - To be determined as additional funding becomes available
    Begin Construction - To be determined as additional funding becomes available

    Other Relevant Links

    Categorical Exclusion - April 2018

    Preliminary Noise Analysis - February 2018

    Town of Leesburg Route 15 Bypass/Edwards Ferry Road Interchange Project Webpage

    Design Public Hearing (Ad) - May 2018
    Meeting Materials

     

    Estimated start date: To be determined as additional funding becomes available

    Estimated completion date: TBD

    Estimated cost of the project: $181.2 million

    Phase: In Design

    UPC: 89890, 119480

    State ID: 0015-253-306, C501, P101, R201

    Federal ID: STP-5A01 (700)

    Other Relevant Links

    Categorical Exclusion - April 2018

    Preliminary Noise Analysis - February 2018

    Town of Leesburg Route 15 Bypass/Edwards Ferry Road Interchange Project Webpage

    Design Public Hearing (Ad) - May 2018
    Meeting Materials

    Second Public Information Meeting (Ad) - March 2017

    First Public Information Meeting - March 2016 

    Display boards

    • Project Location
    • Design Alternative Evaluation Criteria
    • Route 15 Crash Data Analysis
    • Existing Traffic Conditions
    • Projected No-Build Traffic Conditions

     

    Existing intersection of Route 15 and Edwards Ferry Road
    Existing intersection of Route 15 and Edwards Ferry Road

     

    Last updated: March 20, 2024

    Alert Icon

    Please note that this file is not ADA compliant. Choose one of below options: